GS IAS Logo

< Previous | Contents | Next >

3.4.2. SetuBharatam Program

It is for building bridges for safe and seamless travel on National Highways. The aim is to make National Highways free of railway level crossings by 2019 by building Railway Over Bridges/

Under Passes. 1500 old and worn down bridges will be improved by replacement/ widening/strengthening.